Bandit Energy has successfully been managing Major Projects across Western Canada for 20+ years. With an an experienced Major Project's team we are capable of tackling any major project you may have.
We’ve been in the business for 20+ years and have been a leader in the field ever since. We take pride in our work.
Cutting corners is not an option at our company. We do everything thoroughly from the beginning to the end. No excuses and no shortcuts allowed.
We believe in partnerships and love proving the Bandit Difference to our customers. We’ll work our hardest so that we meet your most challenging goals, every time.
We recognize the importance of being highly competitive with our pricing in these tough economic times. Our Ceiling Price Program guarantees our project costs so that you save money.
We have programs in place to ensure that every project is on time and within budget, we will work with you every step of the way to make this a reality.
We have been doing this a long time and have the best people in the industry. When you hire Bandit for your project you get the experience of the entire team working for you.
Epping Pipeline Project
The total project consisted of approximately 56,000m of pipeline within the area and was divided into two programs.
This project involved several different piping products ranging in size from 2 to 8 inch which included Flexpipe, steel and HDPE lines. Several installation methods were also involved during construction including conventional trenching, plowing and directional drilling. There were also numerous well site tie-ins and facility upgrades as well.
Shackleton Pipeline Project
Shackleton area project involved the tying in of 64 wells with over 65+km of pipeline ranging in size from 3 to 10 inch diameter consisting of mainly steel and Flexsteel lines. Multiple facility sites were also constructed and numerous well site upgrades were made.
During construction Bandit crew size ranged from 45-60 full time personnel on site. The project was also successfully completed on time and within the proposed budget.
Heward Gathering System Pipeline Project
Bandit was very pleased to announce the successful completion of the Heward Gathering System in southeastern Saskatchewan. Throughout the years Bandit has installed numerous fiberglass lines and gathering systems with this being one of our largest and most successful to date consisting of over 100+km of fiberglass line as well as multiple steel connections ranging in size from 3 to 8 inch diameter. The fall/winter construction also included numerous facility sites and during peak construction there were over 45+ personnel on site.
Lone Pine Gathering System Pipeline Project
The Lone Pine Gathering System just north of Calgary was another successful project for Bandit Pipeline. Construction included the installation of over 110km of HDPE as well as over 10km of steel line both ranging in diameter from 3 to 6 inches. The majority of the pipeline was installed using plow installation but also included conventional trenching and directional drilling. Facility installation and upgrades were also made and during peak construction there were over 40+ full time employees on site.
Size | Type | Meters | Method | Description |
---|---|---|---|---|
12" | Steel | 10,000 | Trench | Sales Line |
12" | Steel | 12,500 | Trench | Sales Line |
12" | Poly | 35,500 | Trench | Sales Line |
10" | Poly | 12,500 | Plow | Trunk Line |
10" | Steel | 8,000 | Trench | Sales Line |
10" | Steel | 1,800 | Trench | Sales Line |
10" | Steel | 15,000 | Trench | Sales Line |
10" | Poly | 25,000 | Trench | Trunk Line |
10" | Poly | 3,800 | Trench | Water Line |
8″ | Steel | 7,500 | Trench | Trunk Line |
8″ | Steel | 2,500 | Trench | Sales Line |
8″ | Fiberglass | 60,000 | Trench | Trunk Line |
8″ | Steel | 10,000 | Trench | Sales Line |
8″ | Poly | 35,000 | Plow | Trunk Line |
8″ | Steel | 3,500 | Trench | Sales Line |
8″ | Poly | 7,850 | Plow | Trunk Line |
6″ | Steel | 15,000 | Trench | Sales Line |
6″ | Fiberglass | 8,500 | Trench | Trunk Line |
6″ | Steel | 19,650 | Trench | Sales Line |
6″ | Steel | 10,000 | Trench | Sales Line |
6″ | Poly | 45,000 | Plow | Trunk Line |
6″ | Fiberglass | 2,500 | Trench | Water Injection |
4″ | Steel | 15,000 | Trench | Gathering System |
4″ | Fiberglass | 75,000 | Trench | Gathering System |
4″ | Steel | 2,500 | Trench | Water Injection |
4″ | Steel | 9,500 | Trench | Gathering System |
4″ | Composite | 2,000 | Plow | Gathering System |
4″ | Composite | 6,500 | Plow | Gathering System |
4″ | Poly | 35,000 | Trench | Gathering System |
We're Hiring!
Send your resume to careers@banditenergy.ca