MAJOR PROJECTS

Bandit Energy Major Projects

See Past Projects

"WE HAVE A COMMITMENT TO INNOVATION AND EXCELLENCE"

Bandit Energy has successfully been managing Major Projects across Western Canada for 20+ years. With an an experienced Major Project's team we are capable of tackling any major project you may have. 



EXPERIENCE THE BANDIT DIFFERENCE


Industry Leader

We’ve been in the business for 20+ years and have been a leader in the field ever since. We take pride in our work. 

Quality Guaranteed

Cutting corners is not an option at our company. We do everything thoroughly from the beginning to the end. No excuses and no shortcuts allowed. 

Client Focused

We believe in partnerships and love proving the Bandit Difference to our customers. We’ll work our hardest so that we meet your most challenging goals, every time. 

Competitive Pricing

We recognize the importance of being highly competitive with our pricing in these tough economic times. Our Ceiling Price Program guarantees our project costs so that you save money.

On Time & On Budget

We have programs in place to ensure that every project is on time and within budget, we will work with you every step of the way to make this a reality.

Experienced People

We have been doing this a long time and have the best people in the industry. When you hire Bandit for your project you get the experience of the entire team working for you. 

Current and Past Projects

Epping Pipeline Project

The total project consisted of approximately 56,000m of pipeline within the area and was divided into two programs.


This project involved several different piping products ranging in size from 2 to 8 inch which included Flexpipe, steel and HDPE lines. Several installation methods were also involved during construction including conventional trenching, plowing and directional drilling. There were also numerous well site tie-ins and facility upgrades as well.

Shackleton Pipeline Project

Shackleton area project involved the tying in of 64 wells with over 65+km of pipeline ranging in size from 3 to 10 inch diameter consisting of mainly steel and Flexsteel lines. Multiple facility sites were also constructed and numerous well site upgrades were made.


During construction Bandit crew size ranged from 45-60 full time personnel on site. The project was also successfully completed on time and within the proposed budget.

Heward Gathering System Pipeline Project

Bandit was very pleased to announce the successful completion of the Heward Gathering System in southeastern Saskatchewan. Throughout the years Bandit has installed numerous fiberglass lines and gathering systems with this being one of our largest and most successful to date consisting of over 100+km of fiberglass line as well as multiple steel connections ranging in size from 3 to 8 inch diameter. The fall/winter construction also included numerous facility sites and during peak construction there were over 45+ personnel on site.

Lone Pine Gathering System Pipeline Project

The Lone Pine Gathering System just north of Calgary was another successful project for Bandit Pipeline. Construction included the installation of over 110km of HDPE as well as over 10km of steel line both ranging in diameter from 3 to 6 inches. The majority of the pipeline was installed using plow installation but also included conventional trenching and directional drilling. Facility installation and upgrades were also made and during peak construction there were over 40+ full time employees on site.

Size Type Meters Method Description
12" Steel 10,000 Trench Sales Line
12" Steel 12,500 Trench Sales Line
12" Poly 35,500 Trench Sales Line
10" Poly 12,500 Plow Trunk Line
10" Steel 8,000 Trench Sales Line
10" Steel 1,800 Trench Sales Line
10" Steel 15,000 Trench Sales Line
10" Poly 25,000 Trench Trunk Line
10" Poly 3,800 Trench Water Line
8″ Steel 7,500 Trench Trunk Line
8″ Steel 2,500 Trench Sales Line
8″ Fiberglass 60,000 Trench Trunk Line
8″ Steel 10,000 Trench Sales Line
8″ Poly 35,000 Plow Trunk Line
8″ Steel 3,500 Trench Sales Line
8″ Poly 7,850 Plow Trunk Line
6″ Steel 15,000 Trench Sales Line
6″ Fiberglass 8,500 Trench Trunk Line
6″ Steel 19,650 Trench Sales Line
6″ Steel 10,000 Trench Sales Line
6″ Poly 45,000 Plow Trunk Line
6″ Fiberglass 2,500 Trench Water Injection
4″ Steel 15,000 Trench Gathering System
4″ Fiberglass 75,000 Trench Gathering System
4″ Steel 2,500 Trench Water Injection
4″ Steel 9,500 Trench Gathering System
4″ Composite 2,000 Plow Gathering System
4″ Composite 6,500 Plow Gathering System
4″ Poly 35,000 Trench Gathering System
Share by: