Lone Pine Gathering System Pipeline Project

The Lone Pine Gathering System just north of Calgary was another successful project for Bandit Pipeline. Construction included the installation of over 110km of HDPE as well as over 10km of steel line both ranging in diameter from 3 to 6 inches. The majority of the pipeline was installed using plow installation but also included conventional trenching and directional drilling. Facility installation and upgrades were also made and during peak construction there were over 40+ full time employees on site.