Heward Gathering System Pipeline Project

Bandit was very pleased to announce the successful completion of the Heward Gathering System in southeastern Saskatchewan. Throughout the years Bandit has installed numerous fiberglass lines and gathering systems with this being one of our largest and most successful to date consisting of over 100+km of fiberglass line as well as multiple steel connections ranging in size from 3 to 8 inch diameter. The fall/winter construction also included numerous facility sites and during peak construction there were over 45+ personnel on site.