Shackleton Pipeline Project

Shackleton area project involved the tying in of 64 wells with over 65+km of pipeline ranging in size from 3 to 10 inch diameter consisting of mainly steel and Flexsteel lines. Multiple facility sites were also constructed and numerous well site upgrades were made.

During construction Bandit crew size ranged from 45-60 full time personnel on site. The project was also successfully completed on time and within the proposed budget.